Flexible Pavement Design (JKR Method)
Ref: JKR Arahan Teknik Jalan 5/85 (Revised 2013)
Saved to this browser only. Sign in to sync across devices.
ESAL = ADT_cv × TF × 365 × DD × LDF × GF
Ref: JKR Arahan Teknik Jalan 5/85 (Revised 2013)
GF = ((1 + r)^n − 1) / r
Growth Factor
TC from cumulative ESAL → pavement layers from JKR design table
Pavement thickness lookup
Traffic Data
Vehicles >3 tonnes (from traffic count)
Typical 1.0–5.0 (ATJ Table 2)
Typical 4–6% per annum
Typical 10–20 years
Distribution Factors
Typically 0.50 for 2-way roads
1-lane: 1.0, 2-lane: 0.80, 3-lane: 0.60
Subgrade
From lab CBR test (soaked, 4-day)
Disclaimer: This output is an engineering calculation aid only and does not constitute a final or endorsed design. All designs submitted to Malaysian authorities must be endorsed by a registered Professional Engineer (PE) under the Board of Engineers Malaysia (BEM) in accordance with the Registration of Engineers Act 1967.