Final Account Summary
Ref: PWD Form 203A, JKR Final Account Practice
Final Account = Original + VO + PS Adj + PC Adj + Claims − LAD
Ref: PWD Form 203A, JKR Final Account Practice
Original contract value
Net total of all variation orders
Provisional sum in contract
Actual provisional sum spent
Prime cost sum in contract
Actual prime cost spent
Total approved claims (default 0)
Number of days for LAD (default 0)
LAD rate per day (default 0)
Adjusted Contract Sum
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
PS Adjustment
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
PC Adjustment
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
Total LAD
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
Final Account Value
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
Net Difference
—RM
Engineering aid only — final design must be endorsed by a registered PE under BEM.
Percent Variation
—%
Engineering aid only — final design must be endorsed by a registered PE under BEM.