Interim Payment Certificate (IPC)

Ref: PWD Form 203A, JKR Contract Conditions

Saved to this browser only. Sign in to sync across devices.

Amount Due = Gross Valuation − Retention − Advance Recovery − Previous Certified

Ref: PWD Form 203A, JKR Contract Conditions

Value of work completed to date

Value of approved variations

Value of materials stored on site

Total advance payment issued

Retention percentage (typically 5%)

Maximum retention as % of contract sum (typically 5%)

Total contract sum

Total amount previously certified

Cumulative retention from previous certificates

Gross Valuation

RM

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Retention (this cert)

RM

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Cumulative Retention

RM

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Advance Recovery

RM

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Net Valuation

RM

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Percent Complete

%

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Disclaimer: This output is a calculation aid only. Interim certificates must be issued by the Superintending Officer (SO) in accordance with contract conditions.