Preliminary Cost Estimate (PCE)

Ref: JKR / BQSM / CIDB Malaysia Cost Data

Saved to this browser only. Sign in to sync across devices.

Cost = GFA × Adjusted Rate per m²

Ref: JKR / BQSM / CIDB Malaysia Cost Data

Total gross floor area of the building

Total number of storeys

Year for inflation adjustment (base year 2024)

Base Rate

RM/m²

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Location Factor

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Storey Factor

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Inflation Factor

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Adjusted Rate

RM/m²

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Disclaimer: This output is an engineering calculation aid only and does not constitute a final or endorsed design. Actual costs may vary significantly based on site conditions, market rates, and design complexity. Consult a registered Quantity Surveyor (BQSM) for detailed estimates.