CivilCalc.online

Detention Pond Volume (Simplified)

Ref: MSMA 2nd Edition (2012), Chapter 7 (Detention Pond) + Ch 2 Eq. 2.3 (Rational)

Saved to this browser only. Sign in to sync across devices.

V_s = (Q_post − PSD) × t_d × 60

Ref: MSMA 2nd Edition (2012), Chapter 7 (Detention Pond) + Ch 2 Eq. 2.3 (Rational)

Q_pre = C_pre × i × A / 360

Pre-development peak flow

Q_post = C_post × i × A / 360

Post-development peak flow

Try several storm durations to find the critical duration that gives the maximum required storage volume.

Catchment Data

Total contributing catchment area

MSMA Table 2.5 — e.g. 0.30 forest, 0.40 grass cover (major)

MSMA Table 2.5 — e.g. 0.90 terrace house (major), 0.95 commercial

Storm Parameters

From IDF curve for design ARI (typically 100-yr for major system)

Try several durations to find critical (maximum storage) case

Outflow Control (Optional)

Optional — leave blank to use pre-development Q as PSD

Disclaimer: This output is an engineering calculation aid only and does not constitute a final or endorsed design. All designs submitted to Malaysian authorities must be endorsed by a registered Professional Engineer (PE) under the Board of Engineers Malaysia (BEM) in accordance with the Registration of Engineers Act 1967.