Build-up of Rates

Ref: BQSM / JKR Standard Method of Measurement (SMM2)

Saved to this browser only. Sign in to sync across devices.

All-in Rate = (Labour + Material + Plant) × (1 + OH%) × (1 + P%)

Ref: BQSM / JKR Standard Method of Measurement (SMM2)

Daily wage rate for worker

Output per worker per day

Cost of material per unit

Allowance for material wastage

Daily plant hire rate

Plant output per day

Overhead percentage on net rate

Profit percentage on net rate

Labour Rate

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Material Rate

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Plant Rate

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Net Rate

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Overhead

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Profit

RM/unit

Engineering aid only — final design must be endorsed by a registered PE under BEM.

Disclaimer: This output is an engineering calculation aid only. Actual rates may vary based on market conditions, location, and project complexity. Consult BQSM/JKR for official rate references.